Public Works

Construction on State Highway in San Diego County - Caltrans 11 - 423704 I-8 Alpine

Construction on State Highway in San Diego County - Caltrans 11 - 423704 I-8 Alpine

Enhances roadway durability, safety, and long-term performance in eastern San Diego County. Spanning approximately 15 acres, the work includes advanced pavement systems, modern guardrails, and comprehensive stormwater and water quality controls to protect the surrounding environment. Designed with safety, resilience, and environmental compliance in mind, the project supports reliable and long-term transportation improvements.

Four Gee Park Development

Four Gee Park Development

T ransforms the community space into a vibrant, family- and pet-friendly destination. The project features a fenced dog park, playground, walking paths, picnic areas, game boards, and recreational amenities like ping pong and cornhole, all set within drought-tolerant landscaping. Upgraded utilities, accessible parking, and additional features like bike racks and shaded seating ensure a safe, welcoming, and low-maintenance park for everyone to enjoy.

Kimball Avenue Preserve and Storm Drain Improvements

Kimball Avenue Preserve & Storm Drain Improvements

E nhance roadway safety, functionality, and drainage efficiency in a key commercial corridor. The project includes road reconstruction and paving, upgraded industrial driveways, and comprehensive storm drain improvements with new rip rap, box culverts, and utility upgrades. These enhancements create a more durable, efficient, and safe environment for both traffic and surrounding infrastructure.

Pickleball Courts

Pickleball Courts

Transforms nearly two acres into a dynamic recreational hub featuring 17 newly constructed concrete courts. The project includes comprehensive site grading, court surfacing, fencing, lighting, shade structures, drainage, and upgraded parking areas to support a high-quality player experience. Designed for durability and community use, the space offers a welcoming environment for both casual play and competitive matches.

Stewart Park Improvement

Stewart Park Improvement

Created a more inviting and enjoyable space for the community. The project transforms the entire 12-acre site with new playgrounds, a splash pad, walking paths, landscaping, and modern park amenities, along with improved stormwater infrastructure. Designed for families and visitors of all ages, the revitalized park offers a safe, vibrant place to gather, play, and relax.

Construction on State Highway in Los Angeles County - Caltrans 07 - 388704

Construction on State Highway in Los Angeles County - Caltrans 07 - 388704

E nhance roadway safety and functionality through targeted pavement, concrete, and striping upgrades. The work includes asphalt and concrete rehabilitation, updated crosswalks and pavement markings, and the installation of temporary chain-link railing. Carefully coordinated construction and environmental controls ensure smooth execution with minimal impact to the surrounding area.

Commercial & Residential

Carolita Apartments

Carolita Apartments

D esigned to balance modern living with responsible site development. The project features 16 residential buildings, ample parking, and a playground, complemented by integrated bioswales and a dedicated retention basin to manage on-site drainage sustainably. From precise grading to long-term stormwater control, the development reflects a commitment to quality construction and environmentally conscious design.

Quail Valley Menifee Fire Station #5

Quail Valley Menifee Fire Station #5

D elivers a new, modern fire station designed to support efficient emergency response for the growing Menifee community. The work includes site development, landscaping, irrigation, and a new traffic signal to improve access and safety around the facility. Built with both functionality and community needs in mind, this well-designed facility helps keep the community protected today and into the future.

Thousand Oaks Fire Station No. 34

Thousand Oaks Fire Station No. 34

D elivers essential site preparation to support a critical public safety facility, with precise grading across the entire 1.17-acre site. The work includes efficient cut-and-fill operations and utility connection improvements, ensuring a stable, construction-ready foundation that meets the demands of a modern fire station. Designed for accuracy and efficiency, this project reflects a commitment to safety, reliability, and community service.

Westside Fire Station and Related Site Improvements

Westside Fire Station and Related Site Improvements

A full scope of civil and site enhancements to support efficient and dependable emergency operations. The project features durable concrete paving, ADA-compliant access, advanced storm drainage systems, retaining walls, and sustainable bio-retention elements, all constructed to meet strict local and county standards.

EverHome Suites, Foothill Center

EverHome Suites, Foothill Center

A full-scope hospitality development showcasing high-quality construction from structural framing to refined interior finishes. The project integrates advanced building systems, durable materials, and precise craftsmanship to deliver a modern, efficient, and guest-focused lodging experience.

The North County Fire Protection District Fire Station #3

The North County Fire Protection District Fire Station #3

U pdates and expands an existing facility to better serve the Fallbrook community. Thoughtful renovations and added space improve functionality, efficiency, and emergency readiness within a compact site. The result is a modernized station designed to serve both firefighters and the community well into the future.

Institutional & Government

Saddleback College Softball Field and Parking Lot 12A

Saddleback College Softball Field and Parking Lot 12A

T ransforms the campus with a modern softball complex, expanded parking, and improved pedestrian connections. The scope includes demolition of outdated fields, new athletic facilities, utility infrastructure tie-ins, and enhanced pathways that improve access, safety, and overall campus functionality.

Baseball Field Upgrades and Site Improvements at Diamond Ranch High School

Baseball Field Upgrades and Site Improvements at Diamond Ranch High School

M odernize both the varsity baseball and softball facilities with new synthetic infields and outfields, CMU dugouts, and updated scoreboards. The project also introduces a new concession, restroom, and custodial building—bringing essential lower campus utilities to the school for the first time—while delivering fully ADA-compliant access throughout the site.

Baseball Field Upgrades and Site Improvements at Ganesha High School

Baseball Field Upgrades and Site Improvements at Ganesha High School

T ransforms the campus with modern, high-performance athletic facilities designed for both competition and community use. Improvements include new synthetic baseball and softball fields, upgraded CMU dugouts, new scoreboards, a modular restroom building, and fully ADA-compliant access throughout the site.

El Modena High School's Science Center Improvements

El Modena High School's -Science Center Improvements

T ransform the campus into a modern, future-ready learning environment. This project features new state-of-the-art science buildings, upgraded utilities, and refreshed hardscape and landscape elements that enhance both functionality and campus aesthetics. Designed to support innovation and hands-on learning, the improvements create an inspiring space for students and educators alike.

Site Improvements (PSA) at South Gate Middle School

Site Improvements (PSA) at South Gate Middle School

T ransforms the campus with new futsal and pickleball courts, enhanced outdoor spaces, and thoughtfully designed site upgrades. Improvements include ADA-compliant paths of travel, restroom updates, fire alarm device enhancements, new landscaped lawn areas, and a brick-paved plaza—creating a safer, more accessible, and engaging environment for students and the school community.

Campus Entrance Improvement – Phase 1 Project at Santiago Canyon College

Campus Entrance Improvement – Phase 1 Project at Santiago Canyon College

T ransforms the campus gateway with a new drop-off and pick-up area, improved access drive, and a modern roundabout median. Spanning approximately 1.42 acres, the project also upgrades walkways, hardscape, landscaping, and parking to create a safer, more efficient, and welcoming arrival experience for students, staff, and visitors.

Industrial & Energy

Conveyance System for Lake Skinner Reservoir Dam

Conveyance System for Lake Skinner Reservoir Dam

M odernizes critical reservoir infrastructure through the replacement of approximately 4,800 linear feet of existing gunite channel with a durable concrete conveyance system, improving long-term performance and reliability. The scope also includes precision grading across 2.5 acres and roadway improvements, ensuring efficient water management and enhanced site accessibility at Skinner Reservoir in Winchester, California.

Diamond Regional Sewer Lift Station and Dual Force Mains

Diamond Regional Sewer Lift Station and Dual Force Mains

A major infrastructure upgrade that improves wastewater service reliability while planning for future growth. The project includes a new regional lift station and dual HDPE force mains that convey wastewater beneath roadways and the San Jacinto River using trenchless construction methods to reduce surface disruption. Designed for both current needs and future expansion, the system strengthens long-term performance with minimal impact to the surrounding community.

Lee Lake Wells

Lee Lake Wells

A critical infrastructure project supporting reliable water supply in the Lake Elsinore area. The project includes site grading across 2.7 acres and the construction of two production wells, a centralized disinfection facility, and a booster pump station to enhance system efficiency and water quality. Designed to meet growing regional demand, this project strengthens long-term water resilience for the surrounding community.

Santa Ana River Mainstem - Phase II

Santa Ana River Mainstem - Phase II

A large-scale flood control and infrastructure improvement project focused on long-term river stability and public safety near Prado Dam. The work includes construction of a 3,000-foot earthen dike, flood protection systems, drainage and monitoring infrastructure, and critical utility and street improvements. In addition to strengthening flood resilience, the project enhances community access through the inclusion of a bike and pedestrian path along the Santa Ana River Trail.

Henry J. Mills Water Treatment Plant

Henry J. Mills Water Treatment Plant

D elivers critical electrical and infrastructure upgrades to enhance reliability, safety, and long-term operational performance. Scope of work includes high-voltage service improvements, switchgear and generator system upgrades, expanded electrical facilities, and new underground utilities—ensuring resilient, efficient water treatment operations for the community.

R-16.2 Reservoir and Booster Pumping Station

R-16.2 Reservoir and Booster Pumping Station

A critical water infrastructure improvement designed to enhance system reliability and capacity for the City of Yucaipa. The project includes demolition of an existing reservoir and construction of a new 600,000-gallon bolted steel reservoir, a booster pumping station, and comprehensive site grading, piping, and paving. Executed with precision and efficiency, this project demonstrates expertise in complex grading operations and essential municipal water facilities.

Have a Project in Mind?

Ready to join our roster of successful California developments? Whether you need stormwater compliance, site design, or full engineering support, we're ready to deliver results that keep your project on schedule.

What makes our projects successful:

  • Pre-construction planning that prevents delays
  • Real-time problem-solving during construction
  • Relationships with jurisdictions that speed approvals
  • Fixed-price quotes that protect your budget